Project description
Metropolitan Council Environmental Services (Met Council), operator of the metro area wastewater collection and treatment system, is planning to improve the sanitary sewer system that conveys wastewater from Mendota Heights, Mendota, and Lilydale beneath the Mississippi River to Saint Paul.
Although the system continues to convey wastewater today, recent inspections indicate that the existing river crossing no longer provides the long-term reliability, maintainability, or redundancy expected for this critical infrastructure.
Met Council is replacing the existing system with three new pipes beneath the Mississippi River. The new system would be located downstream or northeast of the existing system, just north of the I-35E river bridge.
The existing system will remain in service during construction and a temporary backup system is currently being installed along the I-35E bridge to provide redundancy. With these provisions, no wastewater service disruptions are anticipated. Construction of the new system is anticipated to begin in the spring of 2028.
Hard copies of the
Draft Facility Plan (PDF) will be available for the public to review by November 23 here and at:
- Mendota Heights City Hall, 1101 Victoria Curve, Mendota Heights
- Saint Paul West 7th Library, 265 Oneida Street, Saint Paul
- Metropolitan Council, 390 Robert Street N, Saint Paul
The public comment period is open until December 13 at 5 p.m. To have your comment read at the public hearing, submit by 5 p.m. December 1. Comments are encouraged and can be submitted in the following ways:
- Mail: Alicia Uzarek, Met Council, 390 Robert St. N., St. Paul, MN 55101-1805
- Email: Connect @LilydaleAreaSewer.com
- Voicemail: 651-707-1832
- TTY: 651-291-0904
To request reasonable accommodations during the public hearing, contact
[email protected] or 651-707-1832 before November 20.
Project map
What to expect
The Met Council is committed to being a good neighbor. While we do our best to minimize impacts during construction, some temporary inconveniences may occur as the work takes place. Here is what you can expect:
- Construction traffic
- Lights, noise, vibration, and dust consistent with construction activity
- Temporary odors related to sewer work
- Temporary road and sidewalk detours and/or closures. We will plan appropriate detours and partner with the City of Lilydale, City of Saint Paul, City of Mendota Heights, and MnDOT, to minimize community impacts.
- Temporary impacts to parking lots
Project timeline
- Planning: 2026
- Design: 2027
- Construction: 2028